Huff Distribution Flow Calculator
McHenry County Stormwater Exemption Analysis Tool
Calculate peak discharge and determine detention requirements using ISWS Bulletin 75 data and SCS methodology.
Quick Exemption Analysis
Compare existing vs. proposed conditions to determine if detention is required based on McHenry County thresholds.
- Pipe threshold: <1.0 CFS = exempt
- Swale threshold: <2.5 CFS = exempt
- McHenry County CN methodology
- PDF report generation
Data Lookup
Look up precipitation frequencies, curve numbers, and other reference data from ISWS Bulletin 75.
- Precipitation frequencies (Table 7)
- SCS Curve Numbers
- Huff distributions (Table 26)
- Time of concentration calculator
McHenry County Methodology
Curve Number Approach
- Existing conditions: Use Soil Group B (actual)
- Proposed conditions: Use Soil Group D (conservative)
Flow Reduction Factors
- Impervious added: 0.85 cfs/acre
- Cleared area: 0.30 cfs/acre
This is an innovative approach specific to McHenry County. The conservative use of Soil Group D for proposed conditions accounts for potential soil degradation during construction.